2022 - Spišské Tomášovce, Village WWTP Reconstruction Project
Delivery and installation of machine-wiped rakes to the sewage pumping station. Number of connected equivalent residents: 834 PE
2022 - Veľká Lomnica - Thymos, WWTP Reconstruction Project
Delivery of mechanical pre-treatment upstream the wastewater treatment plant. Technological equipment of the WWTP tank + electrical part.
2022 - Holumnica - Village WWTP Reconstruction Project
Replacement of submersible pumps for raw sewage, including accessories, pipe connections, rake basket, electric winch, aeration elements for the pumping station.
Supply of new blowers, main air distribution with accessories.
Replacement of built-in settling tanks with equipment for settling tanks, delivery of new submersible mixers, replacement of aeration elements and air pipe distribution to the elements.
Delivery of a new submersible pump to the sludge tank, new aerating elements in the sludge tank and air piping to the elements.
Delivery of a new induction flow meter for measuring the flow on the discharge pipe from the pumping station.
The new control system of the mechanical technology line of the WWTP ensuring the control of machines and equipment.
Number of connected equivalent inhabitants: 800 PE
2022 - Košice, Double shell Pumping Station with technology
Delivery and installation of a double-shell rainwater pumping station, including the technological part and the electrical part.
2022 - Malá Domaša, WWTP Extension Project III. Stage + Pumping Station
Delivery and installation of a new biological reactor of the WWTP + pumping station for purified water.
2022 - BELL Zvolen, production and installation of large volume tanks
2022 - Ihľany Village WWTP Reconstruction Project II. Stage – technology extension
• PS 01 PUMPING CHAMBER, MECHANICAL PRE-TREATMENT
• PS 02 BIOLOGICAL TREATMENT AND DISTRIBUTION OF COMPRESSED AIR
• PS 03 BUILT-IN SETTLING TANK
• PS 04 SLUDGE MANAGEMENT
• PS 05 OPERATIONAL POWER DISTRIBUTION
• PS 06 INSTRUMENTATION
• PS 07 AUTOMATED TECHNOLOGICAL OPERATION CONTROL SYSTEM
Number of connected equivalent residents: 1200 PE