VILLAGE WASTE WATER TREATMENT PLANTS

EKOSERVIS SLOVENSKO s.r.o.

VILLAGE WASTE WATER TREATMENT PLANTS
500 - 6 000 inhabitants, 100 - 1 200 m 3 /day


MODULAR WASTE WATER TREATMENT PLANTS


Dedicated for medium contamination sources, villages, towns, residential districts, hotel and canteen facilities... we offer an easy construction of WWTP with low initial investment, possibility to extend the capacity by sections depending on waste water quantity and contamination. This technology significantly simplifies the WWTP construction and enables to achieve investment cost saving in comparison with the conventional biological waste water treatment plant. Modular plants enable to design the facility from several separately operating units and therefore their gradual construction or capacity extension depending on sewage pipeline construction in stages.

ADVANTAGES


  • • high quality of cleaned water
  • • low initial investment cost, quick installation
  • • silent operation
  • • odourless
  • • cost effective operation
  • • reduced production of excessive sludge
  • • automated operation
  • • low operating cost
  • • possibility to easily increase the capacity due to modular type of the plant

DESIGN FOR RESIDENTIAL DISTRICTS, HOTEL AND CANTEEN FACILITIES...


Using this type significantly simplifies the WWTP construction and enables investment cost saving in comparison to the conventional WWTP. Compact feature and small size enable incorporation to the landscape in a close or partially close structure.

CAPACITY EXTENSION POSSIBILITY BY MODULES


- depending on waste water quantity, on contamination, on financial possiblities

BIOLOGICAL TREATMENT PROCESSES


- rough pre-treatment, waste water pumping station, biological reactor, denitrification, nitrification, separation, sludge tank – sludge drainage

WARRANTY


48 months warranty for a complete WWTP. Mechanical equipment, such as blowers, pumps have 24 months warranty. We provide the warranty and after-warranty servicing within 24, or max 48 hours respectively /including the weekends and official holidays/ since recording the failure.


OUR WWTPs PREVIEW



CATALOGUES