Loading...
logo spoločnosti EKOSERVIS s.r.o.
Loading...

REFERENCE PROJECTS

September 2020 – Extension of infrastructure in Trnkov village, WWTP – 2 x BCTS 25
September 2020 – Extension of infrastructure in Trnkov village, WWTP – 2 x BCTS 25

In Trnkov village we have delivered and installed wastewater treatment plant of container type BCTS 25 with associated technology and a sludge tank. After mechanical pretreatment, wastewater will be pumped via distribution object to the new WWTP lines. Biological unit is a compact plastic rectangular tank installed in the ground. The treatment process is provided in the form of fine bubbled aeration. The sludge is thickened and pumped to the sludge tank.
September 29, 2020 – WWTP Milpoš Upgrading Project, II. stage
September 29, 2020 – WWTP Milpoš Upgrading Project, II. stage

In September 2020 our company implemented civil works and delivery of technology equipment for WWTP Upgrading Project, II. stage, which was financed by the Environmental Fund and the municipality. The scope of II. stage included upgrading of one biological line, construction of sludge tank, aeration system, blowers, electrical power cabling and switchboard. After this upgrade the technology parameters of treatment process will improve along with working conditions and the environment in WWTP surroundings.
August 2020 – Delivery and installation of WWTP Frydman (Nižné Lapše), Poland
August 2020 – Delivery and installation of WWTP Frydman (Nižné Lapše), Poland

Our team has successfully implemented delivery and installation of WWTP of SBR type including the installation of stainless steel walk ways inside the plant. The project has been performed in compliance with the agreed time schedule and in the required quality.
22.8.2020 – WWTP Tylmanowa - Ochotnica Dolna Upgrading Project, Poland
22.8.2020 – WWTP Tylmanowa - Ochotnica Dolna Upgrading Project, Poland

Our team successfuly implemented the supply and installation of the existing 6 pcs of reactors and supply of a new reactor with accessories and associated steel structures within the WWTP Tylmanowa Ochotnica Dolna Upgrading Project in Poland.
May 2020 – The Wastewater Treatment Plant MC 500 Oravsky Podzamok Upgrading Project started
May 2020 – The Wastewater Treatment Plant MC 500 Oravsky Podzamok Upgrading Project started

The Project has been supported by a non-repayable financial contribution from the Integrated Regional Operation Program co-financed by European Regional Development Fund form the provider, which is the Ministry of Agriculture and Rural Development of the Slovak Republic. Our company designed an upgrade to the existing WWTP technology by the delivery of new technology equipment. Our designed treatment process technology is based on a principle of biological aerobic treatment inside the biological reactors by a heterogennous biological sludge kept in rise by a pressure air of a fine-bubble aeration system with a full sludge stabilization. The entire process is automatically controlled.
April 2020 – Delivery of aeration system for Wastewater Treatment Plant Michaľany
April 2020 – Delivery of aeration system for Wastewater Treatment Plant Michaľany

The Project included replacement of aeration elements and piping system to the elements inside the activation tank of the village wastewater treatment plant. The scope of work included pumping and cleaning the activation tank and liquidation of wastewater.
In November 2019 our company EKOSERVIS SLOVENSKO s.r.o. implemented the delivery of technology equipment for Wastewater Treatment Plant as part of the Project: „Reconstruction of WWTP at the Hotel Severka, Zákopčie“.
In November 2019 our company EKOSERVIS SLOVENSKO s.r.o. implemented the delivery of technology equipment for Wastewater Treatment Plant as part of the Project: „Reconstruction of WWTP at the Hotel Severka, Zákopčie“.

We converted the current slot type of the tank onto a biological WWTP with SBR reactor, using all the existing WWTP objects. Tanks below the building will serve as excessive sludge tanks. The control system is semi-automatic and can be set to automatic or manual mode. The scope of delivery included pumping, cleaning up the WWTP tank and liquidation of wastewater, disassembly of the existing technology, delivery of manual coarse screen, installation of new SBR system, flow metering, instrumentation, electrical cabling and devices, grease trap. Scope of our works included preparing the design for construction permit, start-up, personnel training.
28/11/2019 – The container WWTP delivered for a customer in Bazanowice village, Poland
28/11/2019 – The container WWTP delivered for a customer in Bazanowice village, Poland

A compact design of a plastic wastewater treatment plant container including a complete technology equipment installed underground, ready for starting up after inflow and outflow piping connection. As a part of our delivery package, we provide an operation and maintenance training for the plant users.
In September – October 2019 the delivery of technology equipment for the WWTP in Prašice village as a scope of the Project titled WWTP Prašice – sludge dewatering, lamellar dehydrator and fine-bubbled aeration system.
In September – October 2019 the delivery of technology equipment for the WWTP in Prašice village as a scope of the Project titled WWTP Prašice – sludge dewatering, lamellar dehydrator and fine-bubbled aeration system.

The delivery consisted of the operation units of coarse pre-treatment, biological reactor and aeration system, sludge system, electrical feed and switchboard. Services provided by our company EKOSERVIS SLOVENSKO s.r.o. also included starting up, personnel training, operation manual preparation. Upgraded technology equipment enhanced the treatment effectivity and improved the operation of wastewater treatment plant that serves to the village citizens and to local entrepreneurs.
November 2019 - for Bachledka Ski & Sun Center our company EKOSERVIS SLOVENSKO s.r.o. implemented delivery and installation of container biological wastewater treatment plant of BCTS 25 type including a two-stage mechanical pre-treatment – the WWTP Capacity Extension Project in Bachledová dolina.
November 2019 - for Bachledka Ski & Sun Center our company EKOSERVIS SLOVENSKO s.r.o. implemented delivery and installation of container biological wastewater treatment plant of BCTS 25 type including a two-stage mechanical pre-treatment – the WWTP Capacity Extension Project in Bachledová dolina.

Visitors number to the Center increased after a new attraction „Walkway in the trees“ opened up. This meant increasing the quantity of communal wastewater. Biological wastewater treatment technology will provide for a high quality of water treatment. By a container type of the WWTP installed in the Center, our company guarantees a top water treatment quality along with saving the built-up area, reducing the excavation and construction scope as well as the construction period.
In November 2019, our company EKOSERVIS SLOVENSKO s.r.o. delivered a technology equipment for a wastewater treatment plant within the project: „Water pipeline system, sewage pipeline system and WWTP Fulianka“.
In November 2019, our company EKOSERVIS SLOVENSKO s.r.o. delivered a technology equipment for a wastewater treatment plant within the project: „Water pipeline system, sewage pipeline system and WWTP Fulianka“.

By the delivery of an upgraded technology, WWTP meets the legislation requirements for wastewater treatment and water quality at the outflow to the recipient. Technology parameters of the treatment have been improved as well as working conditions and environment in the WWTP surroundings. WWTP will have a positive impact on the environment, providing wastewater treatment of part of the village. By WWTP operation, no noise occurs, no aerosols by water spraying, no sensoric failures (bad smell). WWTP functions automatically based on set-up technology parameters. The treatment process is based on a long-term activation with full sludge stabilization including a fine-bubbled aeration system. The produced surplus sludge does not decompose and does not smell. It can be disposed of in accordance with the Waste Act.
In August 2019 our company EKOSERVIS SLOVENSKO s.r.o. completed the III. Stage of delivery and installation of technology for WWTP in village Ždiar.
In August 2019 our company EKOSERVIS SLOVENSKO s.r.o. completed the III. Stage of delivery and installation of technology for WWTP in village Ždiar.

The scope of delivery included mechanical pre-treatment, technology inside the cesspit water tank, technology for selectors, activation DNT and NT tanks, sludge tanks, air piping, instrumentation and cabling system. The scope also included installation, start-up, personnel training, as-built documentation. Technology delivery and works pass-over have been made within Project time schedule and in compliance with the contractual requirements.
In September 2019 team of experts from our company EKOSERVIS SLOVENSKO s.r.o. for the village Milpoš passed over the Project Intensification of wastewater treatment plant.
In September 2019 team of experts from our company EKOSERVIS SLOVENSKO s.r.o. for the village Milpoš passed over the Project Intensification of wastewater treatment plant.

The Project included several civil construction units including the sand trap, pumping station, nitrification, denitrification and sedimentation tank as well as operation units of mechanical pre-treatment, pumping station technology, biological reactor, electrical feed and switchboard. The scope of works included installation, start up, personnel training, as-built design. An upgraded WWTP of sufficient capacity will be providing for a top quality of treatment of communal wastewater in the village. The deliveries and works have been performed in time and in compliance with the contract.